Factory-direct GaN & wireless chargers · MOQ from 200 pcs

Factory Corner

Factory Corner: Machines, Lines and People

A short tour of the equipment that decides how a charger turns out — and what each station is responsible for.

Laser cutting Bending Welding & assembly

Core Machines

Housing and metal parts

Cutting and forming equipment for enclosures, brackets and metal components where a project needs them.

PCBA assembly

Plug-in production and wave soldering under static control, with first-article confirmation before a run starts.

Aging racks

Units run under load for a defined cycle, so early failures happen here rather than at the customer.

Assembly and packing

Final assembly, accessory bundling and carton packing to the agreed layout.

Test Benches

  • Voltage, current and protocol behaviour measured across every output, including PPS ranges.
  • Pressure testing for models where ingress protection is part of the specification.
  • Temperature rise checks under sustained load rather than a single spot reading.
  • QA sampling before packing, with a shipment inspection report attached to the batch.

Operators, Not Just Equipment

Equipment sets the ceiling; practice decides the result. Each station works to a written operation sheet covering tools, handling rules, cautions and pass criteria, and operators are trained against it.

That is also why our defect rate stays under 1% while the category average is frequently quoted at 3–5%.

Tell Us What You Need to Charge

Send the device list, target markets and first order quantity. You get charger options, the certification list for your countries and a costed quotation — usually within 24 hours.

  • Trial orders from 200 pcsEnough to test a channel before committing to a container.
  • Certification groundworkCE, FCC, RoHS, PSE and KC support from the first sample.
  • One project ownerSame person from quotation through samples, production and reorders.