Inside the Shenzhen Factory
Charger programmes move quickly, which means the factory has to handle mixed SKUs, several plug standards and changing assortments without letting quality drift. This is what the plant is built for.
Factory Snapshot
| Product focus | GaN chargers, PD adapters and wireless chargers |
|---|---|
| Power range | 20W to 240W across wall, travel and multi-port formats |
| MOQ | From 200 pcs per model on tooled platforms |
| Client base | Around 200 brands, distributors and private-label teams |
| Quality system | ISO9001-based process control with documented inspection gates |
What the Lines Can Support
Mixed SKU runs
Several models and plug variants on one line, which is normal for charger assortments.
Multi-region builds
EU, UK, US and AUS plug kits assembled to the destination, not to a single domestic standard.
In-line testing
Electrical checks during production, not only at final inspection.
Pilot to volume
First articles and pilot builds, then the same process scaled for volume orders.
How Work Moves Through the Plant
Material preparation and incoming checks, first article confirmation, plug-in and wave soldering, repeated visual inspection, aging under load, pressure and electrical testing, then sampling, packing and shipment — a fixed sequence, documented at each step.
A Factory You Can Show Your Customers
Some of our partners face audits and questionnaires from their own retail customers. That means the factory behind the product has to be ready with documents, answers and access — not just a price list.
Factory access and transparency: you are welcome to visit, or to arrange a video walkthrough with the production team before your next launch.
Tell Us What You Need to Charge
Send the device list, target markets and first order quantity. You get charger options, the certification list for your countries and a costed quotation — usually within 24 hours.
- Trial orders from 200 pcsEnough to test a channel before committing to a container.
- Certification groundworkCE, FCC, RoHS, PSE and KC support from the first sample.
- One project ownerSame person from quotation through samples, production and reorders.